Theatre Gardens

This development, which was previously the home to Rose Tavern, was undertaken for Freetown Developments, and consists of 15 contemporary apartments in Hull City Centre.

The construction included ring beam foundations, brick/block construction, insulated cavity, PCC floors and stairwells, pre made truss roof, traditional slate roof covering.

Contrasting bricks were used to achieve a unique look, and all apartments where built to robust detail specifications. Each apartment is decorated to a high standard, and fitted out with a comprehensive bathroom suite, integrated kitchen and a variety of floor coverings. Each apartment has intercom facilities, with the majority of the apartments having access to a roof garden.

Tarmac car park to the rear of the building.

Project length: 60 weeks